Pembroke LVAC Replacement

Undertaking this project presented us with an array of complex challenges, each demanding a unique and innovative solution. Our core objectives were to provide flexibility, cost-effectiveness, and enhanced safety, and we approached this with a commitment to surpassing industry standards.

The project's scope was vast and intricate, involving the installation and management of thousands of meters of cables, meticulous cable management, the intricacies of confined space working and management, and the responsibilities of asbestos cleaning, removal, and asbestos Cat B working. These multifaceted tasks underscored the intricate nature of the project and the necessity of a comprehensive approach.

To navigate these demands effectively, we proactively established strategic partnerships with experts in their respective fields. These partnerships have played an instrumental role in ensuring that our project teams are equipped with the specific training they require. Furthermore, they have served as a catalyst for the continuous development of the Winshall team, turning it into a well-rounded and adaptable workforce.

One of the most remarkable outcomes of these strategic partnerships has been the dramatic cost savings that we have achieved. Historically, we have relied on specialist contractors with confined space and asbestos expertise to execute projects of this nature. However, through our investment in training and skill development for our own team members, we have substantially reduced our dependence on external specialists. This transformation has translated not only into significant financial savings but also into greater control over project timelines and the quality of our deliverables.

Ultimately, this project is a testament to our unwavering commitment to crafting innovative and all-encompassing solutions that blend flexibility, cost-efficiency, and heightened safety. Through strategic partnerships, we have not only conquered the challenges posed by the project's various components but have also empowered our team to remain at the forefront of delivering ground-breaking, cost-effective, and secure solutions, setting new industry standards in the process.


Louise Maggs

Gloucester and Cheltenham, UK-based web and graphic designer with almost 20 years of industry experience. Graphic design services include web design, logo design, and documentation/print design.

https://graphicdesignbylouise.co.uk
Previous
Previous

Fleet SGT3A Replacement

Next
Next

Melksham SGT6 – Shunt Reactor Replacement