The most notable feat within this project was the design and installation of a pioneering cantilever system extending from the Earth Switch Structure to support a 400KV Surge Arrestor. This groundbreaking innovation eliminated the need for costly and disruptive foundation removal and excavation near buried and above-ground utilities. The result is a structural advancement that not only boosts operational efficiency but also significantly minimizes downtime and resource expenditure.

Furthermore, Winshall undertook the task of repairing, reinforcing, and meticulously sealing the Transformer Bund. This crucial initiative was driven by a commitment to prevent the costly replacement of this integral component. By preserving and strengthening the existing Transformer Bund, the project not only saved valuable time but also ensured that the infrastructure met all regulatory compliance standards. Beyond compliance, this preservation effort has contributed substantially to enhancing sustainability by reducing the need for new materials and construction.

In essence, this project showcases Winshall's dedication to innovation, efficiency, and environmental responsibility. By successfully implementing these key improvements, we have set a new standard for infrastructure design, exemplifying how businesses can achieve remarkable progress by embracing transformative solutions and safeguarding the environment in the process.


Louise Maggs

Gloucester and Cheltenham, UK-based web and graphic designer with almost 20 years of industry experience. Graphic design services include web design, logo design, and documentation/print design.

https://graphicdesignbylouise.co.uk
Previous
Previous

Ninfield SGT4 and SCT& SR6 replacements

Next
Next

Pembroke LVAC Replacement