Aberthaw Power Station Separation of Services
Over the course of nearly two years, we have embarked on a highly complex project that tested our expertise, adaptability, and commitment to safety. This endeavour provided a diverse range of tasks and challenges, each of which was handled with utmost professionalism and dedication, resulting in a remarkable achievement of two accident-free years on-site.
Multiple Customer Interfaces: We engaged with multiple customer interfaces, effectively communicating and coordinating with various stakeholders to ensure a seamless project execution.
Cable and Water Pipe Replacement: The project involved the removal of thousands of meters of cable and water pipe, followed by the installation of new infrastructure. This transformation not only improved system reliability but also positioned the project for future developments.
Demolition and Civil Construction: The scope extended to the demolition and removal of buildings, requiring precision and efficiency in managing these substantial changes. Civil construction and excavation work were carried out in tandem, reshaping the landscape to accommodate new structures.
High-Risk Activity Management: Throughout the project, we diligently managed high-risk activities, prioritizing safety at every stage. This comprehensive approach ensured that the project maintained the highest safety standards.
Temporary Works Management: The complexity of the project demanded the management of temporary works across multiple disciplines. Effective coordination and oversight were essential to maintain project integrity.
LVAC System Refurbishment: The Low Voltage Alternating Current (LVAC) system underwent refurbishment, modifications, and replacement, enhancing the electrical infrastructure's performance and reliability.
Earthing System Enhancements: The earthing system was modified, old installations were removed, and new systems were meticulously installed, ensuring electrical safety and compliance with industry standards.
The most remarkable feat of this project is the impeccable safety record maintained throughout the nearly two-year duration. Despite the inherent challenges in each of the project's facets, our diligent commitment to safety, comprehensive planning, and dedicated execution resulted in zero accidents on-site.
In summary, this project reflects our exceptional capabilities in managing multifaceted endeavors. By successfully tackling a multitude of tasks, ensuring safety at every step, and achieving two accident-free years on-site, we have set a new standard for excellence and safety in the industry.